Akuregoda Solar Plant

Horana

1000 KVA

Project Overview:

Installation of a 1250kVA Transformer Substation to reinforce the site’s medium voltage infrastructure.

ENGINEERING CONSULTATION

Powering your next infrastructure project today

Partner with Sri Lanka’s specialized medium voltage engineering team. We establish resilient electrical networks through engineering excellence, disciplined execution, and uncompromising safety standards for 11kV and 33kV power systems.