Project Overview:
A 4 MW Solar Power Plant where Volt Pacific executed the complete Medium Voltage switchyard construction, encompassing both electrical and civil works.
Key Installations:
- Installation and precise equipment alignment of ABB 36 kV Vacuum Circuit Breakers (VCBs).
- Positioning and integration of two 35 kV outdoor MV power transformers (2 × 2000 kVA) with associated LV auxiliary systems.
- Erection of 35 kV outdoor Current Transformers (5–400 A) for precise ratio selection, polarity, and protection wiring.
- Complete installation of MV switchyard steel structures, busbar supports, and outdoor MV cable terminations.