Akuregoda Solar Plant

Pallekele

6600 KVA

Project Overview:

Extensive power distribution and grid synchronization for the 7 MW site in Pallekele, including the installation of a 6600kVA Transformer Substation.

Key Installations:

  • Execution of an 8.30 km double-circuit 33 kV distribution line utilizing ACSR conductors supported by 222 utility poles.
  • Parallel erection of Low Voltage overhead distribution lines using AAC (All Aluminium Conductor) conductors.
  • Laying 393 meters of underground MV cable (3C 95sq.mm Armoured) to achieve a 2 MW temporary grid energization.
  • Commissioning of a fully equipped switchyard featuring an Autorecloser and CT/PT metering units.