Project Overview:
Extensive power distribution and grid synchronization for the 7 MW site in Pallekele, including the installation of a 6600kVA Transformer Substation.
Key Installations:
- Execution of an 8.30 km double-circuit 33 kV distribution line utilizing ACSR conductors supported by 222 utility poles.
- Parallel erection of Low Voltage overhead distribution lines using AAC (All Aluminium Conductor) conductors.
- Laying 393 meters of underground MV cable (3C 95sq.mm Armoured) to achieve a 2 MW temporary grid energization.
- Commissioning of a fully equipped switchyard featuring an Autorecloser and CT/PT metering units.