Industrial Production Facility

For the Industrial Production Facility in Meegoda, Volt Pacific managed the end-to-end electrical infrastructure to support the plant’s operational load. Our team delivered a fully synchronized system, highlighting our dual expertise in high-voltage equipment and heavy LV cabling: MV Scope: Installation of a 1.6 MVA power transformer, with CT Unit and RVT, and execution of … Read more

Akuregoda Solar Plant

Project Overview: A 4 MW Solar Power Plant where Volt Pacific executed the complete Medium Voltage switchyard construction, encompassing both electrical and civil works. Key Installations:

Clean Energy

Project Overview: Extensive power distribution and grid synchronization for the 7 MW site in Pallekele, including the installation of a 6600kVA Transformer Substation. Key Installations:

Janatha Steel

Project Overview: High-capacity electrical routing and inverter integration for a 1 MW Rooftop Solar Project in Uswetakeiyawa, along with the installation of a 1250kVA Transformer Substation. Key Installations:

Senora Pvt Ltd

Project Overview: Installation of a 1250kVA Transformer Substation to manage the facility’s medium voltage power requirements.

Snackings Pvt Ltd

Project Overview: Installation of a 1250kVA Transformer Substation to support the site’s electrical infrastructure.

Ceylon Beverage International

Project Overview: Execution and installation of a heavy-duty 2500kVA Transformer Substation for the facility in Horana.

Prima Ceylon Agro Industries

Project Overview: Installation of a 2500kVA Transformer Substation to provide reliable electrical distribution for the operations in Seeduwa.

Coates Tread

Project Overview: Installation of a 1250kVA Transformer Substation to reinforce the site’s medium voltage infrastructure.